Road Projects

Project Gallery

Overview

 

Stag Infra Project Ltd. is proud to announce the successful completion of the road connectivity project from Aava to Badoli in Tonk district, Rajasthan, done for the Public Works Department. The total road length that we constructed is 11.6 kilometers with varying widths from 3.75 meters to 5.30 meters to ensure safer transportation for local communities. Our scope of work involves 1 meter of road expansion, starting with 8 inches of GSV (Granular Sub-Base), followed by 8 inches of WMM (Wet Mix Macadam), topped with an 80 mm damar layer for a strong and durable finish. We smoothed water drainage and infrastructure, installed 1000 DI-K conveyor pipes, and constructed puliyas with valves in CC (cement concrete) structure, ensuring long-term performance.
Additional work included a 1-meter deep cutting, layered with 8 inches of GSV, 6 inches of WMM, 5 inches of DLC (Dry Lean Concrete), and 6 inches of CC for a solid and reliable base. We installed 55 signboards and 55 kilometer stones along the route for clear navigation and road safety. This project is a milestone in rural infrastructure development, reflecting Stag Infra Projects Ltd.
 

Contact us for any Query